Arkansas Democrat-Gazette

OIL AND GAS REPORT

-

The Arkansas Oil and Gas Commission last week issued three well recompleti­ons. By county, they were:

WELL RECOMPLETI­ONS

WHITE — Merit Energy Co. LLC of Dallas for Charles No. 8-9 3-13H, 24-hr. prod. 255 in Fayettevil­le Form. of B-43 Fld. Drilled to TD: 9,225 ft., perf. 5,137-9,114 OA ft. Loc. SHL: 671 ft. FNL & 1,180 ft. FWL and BHL: 101 ft. FSL & 1,039 ft. FWL of Sec. 138N-9W. Workover done Dec. 20, 2019.

Merit Energy Co. LLC for Harris No. 8-9 1-26H, 24-hr. prod. 283 in Fayettevil­le Form. of B-43 Fld. Drilled to TD: 10,026 ft., perf. 5,981-9,937 OA ft. Loc. SHL: 200 ft. FSL & 985 ft. FWL and BHL: 492 ft. FNL & 575 ft. FWL of Sec. 26-8N-9W. Workover done Jan. 9.

Merit Energy Co. LLC for Mary Smith No. 9-5 1-34H, 24-hr. prod. 247 in Fayettevil­le Form. of B-43 Fld. Drilled to TD: 8,963 ft., perf. 4,6778,857.6 OA ft. Loc. SHL: 520 ft. FSL & 1,514 ft. FEL and BHL: 489 ft. FNL & 1,757 ft. FWL of Sec. 34-9N-5W. Workover done Jan. 8. ABBREVIATI­ONS

Loc. — location; Perf. — perforatio­ns; FEL — from the east line; FNL — from the north line; FSL — from the south line; FWL — from the west line; FEUL — from the east unit line; FWUL — from the west unit line; FNUL — from the north unit line; FSUL — from the south unit line; MCF — thousand cubic feet; bbl — barrel; MD — measured depth; TD — total depth; TVD — true vertical depth; PBTD — plug back total depth; BHL — bottom hole location; PBHL — proposed bottom hole location; SHL — surface hole location; OA — overall; N/A — not available.

Newspapers in English

Newspapers from United States