BASIC flaws with the cladding at Grenfell Tower and an extraordin­ary litany of fire safety failings caused the inferno that claimed 72 lives, it was revealed yesterday.

On the first day of formal evidence at the Grenfell Tower Inquiry, a devastatin­g report found the cladding was ‘substantia­lly to blame’ for fuelling a blaze that leapt 19 floors in just 12 minutes.

Its flammable plastic core helped fuel the fire and produced toxic smoke that slowed firefighte­rs, while its design contribute­d to the ‘catastroph­ic’ spread of the flames.

The report was just one of five presented to the inquiry yesterday, outlining an incredible catalogue of failures encompassi­ng virtually every aspect of fire safety at the block in Kensington, west London.

Almost all elements of fire safety at the tower failed – from dangerous fire doors and windows to firefighte­rs who inadverten­tly helped the flames to spread – leading to a ‘disproport­ionately high loss of life’.

A fire safety engineer said there was ‘a culture of non-compliance’ at the tower during its £9million refurbishm­ent and its maintenanc­e by a council-appointed body.

The failures allowed the fire to engulf the building at a rate never seen before.

But despite the terrifying speed of the fire’s spread, families in the high rise were told to ‘stay put’ and await rescue in a fire brigade policy that may have cost lives.

Experts told the inquiry the policy had ‘effectivel­y failed’ within 30 minutes of the first 999 call. Despite this, it was not formally abandoned until almost two hours after the blaze broke out.

The public inquiry revealed shocking photograph­s showing the devastatio­n at Flat 16, where the fire broke out on the fourth floor, and a recording of the first 999 call. The five expert reports revealed:

Cladding installed during the refurbishm­ent contained a flammable plastic that gave the fire a ‘fuel source’

It did not comply with building regulation­s and no full-scale tests had been carried out before it was installed

Fire stops between each floor were not installed correctly, meaning nothing prevented the fire jumping between levels

Ineffectiv­e fire doors failed after just 20 minutes instead of an hour

Windows were not fire-resistant, and window frames were surrounded by combustibl­e plastic

The building’s only stairwell filled with smoke after ventilatio­n systems failed and doors were blocked open by firefighte­rs’ hoses and – in one case – a dead body

Firefighte­rs did not tackle the kitchen fire that sparked the blaze until four minutes after it had spread up the outside cladding

Water supply systems in the block, installed for firefighte­rs’ hoses, could not meet demand

The ‘stay put’ policy began to fail 21 minutes after the first 999 call, but was kept for two hours.

The inquiry has heard heartbreak­ing evidence from families who lost relatives in the inferno.

The inquiry’s lead lawyer, Richard Millett QC, said survivors and the bereaved were left with ‘an abiding sense of injustice, betrayal and marginalis­ation, leading to an overwhelmi­ng question: Why?’.

He said the inquiry – the largest of its kind in British legal history – would ‘lay bare the truth’.

He said Grenfell Tower’s refurbishm­ent had ‘created an intolerabl­e fire hazard’ and called the cladding on the outside of the building ‘a catastroph­ic failure’.

Authoritie­s believed any fire inside would be limited to the flat where it broke out, and were caught out by the ‘unpreceden­ted’ speed and ferocity of the blaze.

Mr Millett made thinly veiled criticisms of the firms and public bodies involved in the tower’s constructi­on, refurbishm­ent and maintenanc­e – all of which have been asked to provide written

‘Intolerabl­e hazard’

statements. It was owned by Kensington and Chelsea council and run by its tenant management group.

In a statement, London Fire Brigade commission­er Dany Cotton said: ‘I have never seen a building where the whole of it was on fire. Nobody has ever seen that. It was incredible, so alien to anything I have ever seen.’ Firefighte­rs arrived six minutes after the first 999 call at 12.54am, but did not enter the kitchen of Flat 16 until 1.14am or begin fighting the fire until 1.20am, by which time it had burned through the new windows’ flammable uPVC frames and lit the exterior cladding.

 ??  ?? 1.29AM Devastatin­g: Barely 20 minutes later, the entire tower is on fire